Monday, 10 February 2014
CHENNAI METRO........
Chennai Metro
Not to be confused with Chennai Metropolitan Area.
For the elevated railway in Chennai, see Mass Rapid Transit System (Chennai).
Chennai Metro Rail
Background
Owner Chennai Metro Rail Limited (CMRL)[1]
Locale Chennai, Tamil Nadu, India
Transit type Rapid Transit
Number of lines 2 (under construction in Phase I)
3 (proposed in Phase II)
Number of stations 41 (Phase I + extension)
Chief executive Pankaj Kumar Bansal, MD[2]
Headquarters Chennai
Website http://www.chennaimetrorail.gov.in/
Operation
Operation will start October 2014
Operator(s) CMRL
Number of vehicles 42 (Phase I)
Train length 86.5 m
Technical
System length 117.046 km (72.73 mi) [Phase I, extension and Phase II]
Track gauge standard gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
Top speed 80 km/h (50 mph)
The Chennai Metro Rail (Tamil: சென்னை மெட்ரோ ரயில்) is a rapid transit system currently under construction in Chennai, Tamil Nadu, India. Phase I of the project, which consists of two corridors covering a length of 45.1 km is currently under construction. The elevated section of the project is scheduled to be operational by mid 2014 and the entire project is scheduled to be completed by the financial year 2014-2015. About 55% of the corridors in Phase I are underground and the remaining corridors are elevated.
Background
History
Design
Lines and routes
Rolling stock
Power Supply
Maintenance
Administration
Fares
Stations
Proposed connections
Future expansion
Parks taken over for construction
Accidents and incidents
Gallery
See also
References
External linksRead in another language
Last modified 2 days ago
MobileDesktop
Content is available under CC BY-SA 3.0 unless otherwise noted.
Terms of usePrivacy
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment